Title: Resloping coal mine spoils at the Fording River Operations
Author: Berdusco, Roger Joseph; Lane, O. P.
Issue Date: 1985
Publicly Available in cIRcle 2010-01-06
Series/Report no. British Columbia Mine Reclamation Symposium 1985
Abstract: Fording Coal Limited operates the Fording River Operations coal mine located in southeastern British Columbia, Canada. The mine site, as shown in Figure 1, is within the medial range of the southern Canadian Rocky Mountains, approximately 136 km north of the United States - Canadian border, and 6 to 12 km west of the British Columbia - Alberta provincial border. The Fording River Operations produces an average of 4 million tons of cleaned coal per annum, primarily for export to Japan. Both thermal and metallurgical coal are produced at the minesite. Mining operations commenced in 1972 and are carried out on a continuous basis. The operations employ both truck/shovel and dragline mining techniques in multiple seam pits. Total material moved annually is approximately 42.6 million bank cubic metres (BCM) of waste and 6.0 million BCM of raw coal. This report summarizes the rationale and background with respect to resloping spoils at the minesite and describes the spoil resloping project carried out in 1984 in the South Greenhills spoil area.
Affiliation: Applied Science, Faculty of
URI: http://hdl.handle.net/2429/17620

This item appears in the following Collection(s)

Show full item record

All items in cIRcle are protected by copyright, with all rights reserved.

UBC Library
1961 East Mall
Vancouver, B.C.
Canada V6T 1Z1
Tel: 604-822-6375
Fax: 604-822-3893