Go to  Advanced Search

Reclamation at Island Copper

Show full item record

Files in this item

Files Size Format Description   View
1977 - Pelletier - Reclamation at Island Copper.pdf 104.1Kb Adobe Portable Document Format   View/Open
 
Title: Reclamation at Island Copper
Author: Pelletier, Clem A.; Hillis, Ron J
Issue Date: 1977
Publicly Available in cIRcle 2010-01-11
Series/Report no. British Columbia Mine Reclamation Symposium 1977
Abstract: Utah Mines Ltd. operates a large open pit copper mine located on the north shore of Rupert Inlet on the northern end of Vancouver Island. Since 1970 the Environmental Department at Island Copper has been responsible for mine reclamation studies and operations. Initial studies included a detailed assessment of soils and forest productivity in the area. Initial operations included planting 60 acres of disturbed ground around the plant facilities and access road. Subsequent operations have included test plots and stabilization of waste dump outslopes.
Affiliation: Applied Science, Faculty of
URI: http://hdl.handle.net/2429/17991

This item appears in the following Collection(s)

Show full item record

All items in cIRcle are protected by copyright, with all rights reserved.

UBC Library
1961 East Mall
Vancouver, B.C.
Canada V6T 1Z1
Tel: 604-822-6375
Fax: 604-822-3893