Planning, construction and operational challenges of Suncor’s 1st sand dump

Show full item record

Files in this item

Files Size Format Description   View
Ali_Zulfiqar_TMW_2011.pdf 1.607Mb Adobe Portable Document Format   View/Open
 
Title: Planning, construction and operational challenges of Suncor’s 1st sand dump
Author: Ali, Zulfiqar
Issue Date: 2011-11-04
Publicly Available in cIRcle 2011-10-13
Series/Report no. Tailings and Mine Waste 2011: Vancouver, Canada
Abstract: In 2009, Suncor Energy Inc.’s Oil Sands operation in Fort McMurray, AB, began the process of changing to a new technology for the treatment of the tailings streams coming from their water-based extraction process. This new treatment, known collectively as Tailings Reduction Operations (TRO™), is based on two primary technologies: Mature fine tailings (MFT) drying, and the construction of elevated and draining sand dumps. Most of the public information on TRO™ has been focused on the MFT drying components, with less attention paid to the technically simpler but operationally complex systems required to build stacks of tailings sand contained within sand dykes at the rates required to sustain production. This paper discusses the planning and operational challenges of constructing the sand dump rising at the rate of 20 meters per year while maintaining continuous oil sands production and structural integrity of the dump. [All papers were considered for technical and language appropriateness by the organizing committee.]
Affiliation: Non UBC
URI: http://hdl.handle.net/2429/37949
Peer Review Status: Unreviewed
Scholarly Level: Other

This item appears in the following Collection(s)

Show full item record

All items in cIRcle are protected by copyright, with all rights reserved.

UBC Library
1961 East Mall
Vancouver, B.C.
Canada V6T 1Z1
Tel: 604-822-6375
Fax: 604-822-3893