Go to  Advanced Search

Investigating the reprocessing of Carolin mine tailings

Show full item record

Files in this item

Files Size Format Description   View
Daniel_A_et_al_TMW_2011.pdf 654.9Kb Adobe Portable Document Format   View/Open
 
Title: Investigating the reprocessing of Carolin mine tailings
Author: Daniel, Adrian; Downing, Bruce W.
Issue Date: 2011-11
Publicly Available in cIRcle 2011-11-04
Series/Report no. Tailings and Mine Waste 2011: Vancouver, Canada
Abstract: During the ten year period between Aug 2001 and Aug 2011 the price of gold has experienced an increase of nearly 1500 USD, a jump from 300 USD/oz to close to 1800 USD/oz. This has resulted in a resurgence of interest in gold tailings for what was once below cutoff grade material which is now valuable ore. The tailings at Carolin Mine are the post-processed product from the previous operation which ran from 1982 to 1984 when the average overall gold recovery was 50.2%. This low recovery indicates that a substantial amount of gold-bearing material was sent to the tailings impoundment. This paper describes the history and methodology used in re-evaluating the Carolin mine tailings material as part of a metallurgical feasibility program. [All papers were considered for technical and language appropriateness by the organizing committee.]
Affiliation: Non UBC
URI: http://hdl.handle.net/2429/38771
Peer Review Status: Unreviewed
Scholarly Level: Other

This item appears in the following Collection(s)

Show full item record

All items in cIRcle are protected by copyright, with all rights reserved.

UBC Library
1961 East Mall
Vancouver, B.C.
Canada V6T 1Z1
Tel: 604-822-6375
Fax: 604-822-3893