Go to  Advanced Search

Building stakeholder engagement in sustainable solutions : the strategic advisory panel on selenium management

Show simple item record

dc.contributor.author Swanson, S.
dc.contributor.author Abbott, R.
dc.contributor.author Funk, W.
dc.contributor.author Kirk, L.
dc.contributor.author McKenna, G.
dc.contributor.author Ohlendorf, H.
dc.contributor.author Sandy, T.
dc.date.accessioned 2012-05-30T15:57:04Z
dc.date.available 2012-05-30T15:57:04Z
dc.date.issued 2011
dc.identifier.uri http://hdl.handle.net/2429/42431
dc.description.abstract The Strategic Advisory Panel on Selenium Management is a broadly-based group of experts who have achieved success via independent, transparent stakeholder engagement with full collaboration across diverse disciplines. The Panel was formed in January 2010 to assist Teck Coal and its stakeholders in finding a sustainable approach to the management of selenium released from Teck‟s metallurgical coal mines in south-eastern BC and north-western Alberta. The Panel‟s Charter stipulated that the Panel would operate independently and would release a strategic plan for the management of selenium within six months. While part of the Panel‟s work was highly technical, an equally important activity was active engagement with stakeholders. Selenium is a controversial topic with significant technical uncertainties, and often with strongly held views by potentially affected people (concerning their health or effects on ecosystem services). Past attempts to deal with these uncertainties had not succeeded in producing an acceptable plan for managing selenium loadings to the watershed, which were steadily increasing. Trust among stakeholders was low. The Panel used one-on-one meetings, workshops, site visits, and community meetings to reach out to Teck personnel, regulators, First Nations, NGOs, elected officials, and representatives of key stakeholder groups such as fly fishers. The Panel‟s engagement activities, combined with the release of the strategic plan report without prior review by stakeholders (including Teck) produced a substantial increase in trust and engagement. The rapid acceptance of the report by the CEO of Teck Coal added to that trust. The involvement of stakeholders has continued into the implementation phase, which includes management of selenium at legacy waste dumps, incorporation of new operating procedures at active mines, inclusion of alternative mine and waste management practices for proposed expansions and new mines, and Teck‟s continued engagement with a community-based watershed-health advocacy group. The continued engagement of stakeholders is an integral part of Teck‟s commitment to sustainable mining. The Panel‟s experience shows that independent advisory panels can be an effective catalyst for trust-building, especially if their activities truly are governed by sustainability principles. en_US
dc.language.iso eng en_US
dc.relation.ispartofseries Mine Closure Conference 2011 en_US
dc.title Building stakeholder engagement in sustainable solutions : the strategic advisory panel on selenium management en_US
dc.type text en_US
dc.type.text conference Paper en_US
dc.description.affiliation Applied Science, Faculty of en_US
dc.description.affiliation Non UBC en_US
dc.description.reviewstatus Unreviewed en_US
dc.rights.copyright Australian Centre for Geomechanics (ACG) en_US
dc.description.scholarlevel Other en_US


Files in this item

Files Size Format Description   View
Swanson_S_et_al_Mine_Closure_2011.pdf 259.6Kb Adobe Portable Document Format   View/Open
 

This item appears in the following Collection(s)

Show simple item record

All items in cIRcle are protected by copyright, with all rights reserved.

UBC Library
1961 East Mall
Vancouver, B.C.
Canada V6T 1Z1
Tel: 604-822-6375
Fax: 604-822-3893