Site specific testing for sediment pond design at mine sites to lower the risk exceeding discharge total suspended solids and turbidity

Show simple item record

dc.contributor.author Clark, J. P.
dc.date.accessioned 2012-10-11T23:03:41Z
dc.date.available 2012-10-11T23:03:41Z
dc.date.issued 2012
dc.identifier.uri http://hdl.handle.net/2429/43376
dc.description.abstract A literature search for best management practice guidelines for site specific design and operation of sediment ponds revealed few papers describing site specific testing of soils. Sediment pond discharge quality is primarily related to climatology, geology, soils, vegetation, topography, hydrology, erosion control, pond area, and application of settling aids, and the application/implementation of sediment related management plans. Accurate prediction/characterization of how the soils will behave in the sediment pond is recommended by performing particle size analyses and appropriate settling tests on prepared representative soil suspensions. The timing for performing these tests relative to an Environmental Assessment (EA) process is discussed so that an erosion control management plan and a sediment pond management plan are developed prior to entering the EA process. This allows regulators to: (a) accurately assess these sediment-related issues; (b) provide support to the subsequent effluent permitting phase; and (c) accelerate effluent permitting within the current context of the “One Project, One Process” initiative with relatively low environmental risk. Balance and linkage between the erosion control and sediment pond management plans should incorporate design features to complement each other to lower the risk of exceeding mine discharge and receiving water quality standards. en_US
dc.language.iso eng en_US
dc.relation.ispartofseries British Columbia Mine Reclamation Symposium 2012 en_US
dc.subject sediment en_US
dc.subject management plans en_US
dc.subject settling tests en_US
dc.subject effluent permits en_US
dc.subject discharge en_US
dc.title Site specific testing for sediment pond design at mine sites to lower the risk exceeding discharge total suspended solids and turbidity en_US
dc.type text en_US
dc.type.text conference Paper en_US
dc.description.affiliation Applied Science, Faculty of en_US
dc.description.affiliation Non UBC en_US
dc.description.reviewstatus Unreviewed en_US
dc.rights.copyright British Columbia Technical and Research Committee on Reclamation en_US
dc.description.scholarlevel Other en_US


Files in this item

Files Size Format Description   View
Clark_J_et_al_BC_Mine_2012.pdf 166.0Kb Adobe Portable Document Format   View/Open
 

This item appears in the following Collection(s)

Show simple item record

All items in cIRcle are protected by copyright, with all rights reserved.

UBC Library
1961 East Mall
Vancouver, B.C.
Canada V6T 1Z1
Tel: 604-822-6375
Fax: 604-822-3893