- Pinchi Lake mine closure : demolition debris disposal
Open Collections
British Columbia Mine Reclamation Symposium
Pinchi Lake mine closure : demolition debris disposal Marsland, Rob; Unger, Michelle; Donald, Bruce
Abstract
The Pinchi Lake mine operated from 1940 to 1944, and again between 1968 and 1975. Between 2010 and 2012, the mine underwent decommissioning and reclamation. This paper reviews the development of the plans for on-site disposal of demolition debris from decommissioning of the infrastructure including the ore processing and roasting facilities. This paper describes: the investigations by Teck to evaluate disposal options, including identification of the challenges associated with the recycling of scrap metal that could potentially be contaminated with mercury; the involvement of local First Nations in the process; and, the subsequent evaluation of on-site disposal options. The selected on-site disposal option of backfilling part of an open pit with the debris and waste rock was accepted by the First Nations and was also approved by the regulators. The design of the landfill, the waste testing and emplacement requirements and the results of the environmental monitoring are provided.
Item Metadata
Title |
Pinchi Lake mine closure : demolition debris disposal
|
Creator | |
Contributor | |
Date Issued |
2013
|
Description |
The Pinchi Lake mine operated from 1940 to 1944, and again between 1968 and 1975. Between 2010
and 2012, the mine underwent decommissioning and reclamation. This paper reviews the development of
the plans for on-site disposal of demolition debris from decommissioning of the infrastructure including
the ore processing and roasting facilities. This paper describes: the investigations by Teck to evaluate
disposal options, including identification of the challenges associated with the recycling of scrap metal
that could potentially be contaminated with mercury; the involvement of local First Nations in the
process; and, the subsequent evaluation of on-site disposal options. The selected on-site disposal option
of backfilling part of an open pit with the debris and waste rock was accepted by the First Nations and
was also approved by the regulators. The design of the landfill, the waste testing and emplacement
requirements and the results of the environmental monitoring are provided.
|
Subject | |
Genre | |
Type | |
Language |
eng
|
Date Available |
2013-10-18
|
Provider |
Vancouver : University of British Columbia Library
|
Rights |
Attribution-NonCommercial-NoDerivatives 4.0 International
|
DOI |
10.14288/1.0042649
|
URI | |
Affiliation | |
Peer Review Status |
Unreviewed
|
Scholarly Level |
Other
|
Rights URI | |
Aggregated Source Repository |
DSpace
|
Item Media
Item Citations and Data
Rights
Attribution-NonCommercial-NoDerivatives 4.0 International