- Library Home /
- Search Collections /
- Open Collections /
- Browse Collections /
- British Columbia Mine Reclamation Symposium /
- A tale of two pit lakes : the Kemess Mine expansion
Open Collections
British Columbia Mine Reclamation Symposium
A tale of two pit lakes : the Kemess Mine expansion Marsland, Rob; Booker, Rob; Bent, Harold
Abstract
Northgate Minerals is currently considering expanding their Kemess Mine operation to include the nearby Kemess North open pit. As part of the environmental impact assessment, post-closure pit pond hydrologic and water quality models were developed for both the existing Kemess South open pit and the proposed Kemess North open pit. This paper describes the methods used to develop the models and compares the approach taken for the two pits.
Item Metadata
Title |
A tale of two pit lakes : the Kemess Mine expansion
|
Creator | |
Contributor | |
Date Issued |
2005
|
Description |
Northgate Minerals is currently considering expanding their Kemess Mine operation to include the nearby Kemess North open pit. As part of the environmental impact assessment, post-closure pit pond hydrologic and water quality models were developed for both the existing Kemess South open pit and the proposed Kemess North open pit. This paper describes the methods used to develop the models and compares the approach taken for the two pits.
|
Extent |
574502 bytes
|
Genre | |
Type | |
File Format |
application/pdf
|
Language |
eng
|
Date Available |
2009-06-08
|
Provider |
Vancouver : University of British Columbia Library
|
Rights |
Attribution-NonCommercial-NoDerivatives 4.0 International
|
DOI |
10.14288/1.0042474
|
URI | |
Affiliation | |
Peer Review Status |
Unreviewed
|
Scholarly Level |
Other
|
Copyright Holder |
British Columbia Technical and Research Committee on Reclamation
|
Rights URI | |
Aggregated Source Repository |
DSpace
|
Item Media
Item Citations and Data
Rights
Attribution-NonCommercial-NoDerivatives 4.0 International